EasyManua.ls Logo

Arjo Enterprise 5000X - Page 45

Arjo Enterprise 5000X
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
WARNING
The procedures below must be carried out by suitably trained and qualified personnel.
Failure to do so may result in injury or an unsafe product.
Actions to be done by qualified personnel Yearly
Carry out a full test of all electrical bed positioning functions (backrest, height, tilt,
etc.)
9
9
Check that the bedstripper / linen shelf remains in its closed position when
maximum foot down tilt is applied.
9
Check that the bed operates correctly using the backup battery as described in the
next section Battery test.
9
Check operation of the manual CPR release handles on both sides of the bed
9
Check operation the of castors, paying special attention to braking and steering
functions
9
Check that the calf section latches securely in the horizontal (vascular) position
when manually raised.
9
Check that the bed extension locks securely in all three positions
9
Examine the power supply cord and mains plug – if damaged, replace the complete
assembly; do not use a rewireable plug
9
Examine all accessible flexible cables for damage and deterioration
9
Check all accessible nuts, bolts and other fasteners are present and correctly
tightened
9
Check any accessories fitted to the bed, paying particular attention to fasteners and
moving parts
9

Related product manuals