EasyManua.ls Logo

Asko DC7784HP - UNPACKING; Initial Inspection and Delivery Check; Assembly Kit Contents

Asko DC7784HP
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
2x Screw TRX 5x45
fzk for wall mounting
4x Screw MRT 5x20
for the xing bracket
2x Plastic
plug
2x Bracket
for wall
attachment
1.5 m Plastic
hose 10 x 13
1x Nipple for
water hose
Hand brush for
lter
2x Clothes
hanger rack
____________________________________
Check to make sure that the product has
not been damaged in transit. Any dam-
age incurred in transit must be reported
to the dealer within 7 days.
____________________________________
____________________________________
After unpacking, check that the product is
intact. Damage, defects and any missing
parts must be reported to the dealer.
____________________________________
_________________________________
Check that all transport securing
devices have been removed before
connecting the drying cabinet.
_________________________________
_________________________________
Packaging materials such as plastic
and Styrofoam must be kept out of
the reach of children.
________________________________
Complete delivery must include:
Cabinet with pre-installed dehumidifier
Assembly kit
User Manual
ASSEMBLY KIT
UNPACKING

Related product manuals