EasyManua.ls Logo

Atag Q 25S - Page 17

Atag Q 25S
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation & Servicing Instructions ATAG Q-Series
17
The appliance connection diameter is 80/125 mm, to which the ue gas outlet and air
supply system can be tted, with or without elbow pieces. The maximum permissible
pipe length is set out in Table 5.
Boiler conversion from concentric to parallel
It is also possible to use a parallel pipe connection of 2x 80mm. In this case a con-
version kit 'concentric tot parallel' should be ordered. Art.nr. S4440520.
A. 1. Push the 2 clips slightly outwards.
B. 2. Pull the concentric adaptor out of the boiler.
3. Press the cover in the connection at the back from inside out.
C. 4. Pull the rubber seal around the bottom of the ue connector.
5. Push the ue connector in the boiler, in the boiler ue pipe until
‘CLICK’.
6. Push the ø125mm cover over the ue connector in the ø125mm
opening until ‘CLICK’.
7. Push the rubber plug in open position in the O
2
measuring opening and
close the stop.
8. Push the gasket around the top of the ue connector.
D. Connect the parallel ue gas and air intake system (2x ø80mm).
A
1
B
2
3
C
4
7
5
6
8
D
boiler conversion from
concentric to parallel
gure 7

Other manuals for Atag Q 25S

Related product manuals