• IP address information configuration on page 37
• Stack configuration on page 39
Installation Preparation
This task flow shows the sequence of procedures you perform to prepare for ERS 5000
installation.
Installation Preparation Task Flow
Navigation:
• Installation preparation on page 43
• Verifying environment suitability on page 43
• Verifying the package contents on page 45
Switch placement
This task flow shows the sequence of procedures you perform to place the switch.
Installation Preparation
Installing Avaya Ethernet Routing Switch 5000 Series December 2013 33