Switch Placement Task Flow
Navigation:
• Mounting on a table or shelf on page 46
• Mounting on a wall on page 48
•
Installing a front mounted switch in an equipment rack on page 50
• Installing a rear mounted switch in an equipment rack on page 52
Power connection
This task flow shows the sequence of procedures you perform to connect power.
Installing the switch
34 Installing Avaya Ethernet Routing Switch 5000 Series December 2013
Comments? infodev@avaya.com