ESS failover examples
Issue 1.1 June 2005 33
The customer is now ready to have the Main server control the configuration (see Figure 8).
Moving the Port Networks back to the control of the Main server can be accomplished by:
● Moving each Port Network individually using the get forced-takeover
ipsi-interface port-network [N] (where N is the number of the Port Network)
command,
● Moving all Port Networks at one time using the get forced-takeover
ipsi-interface all command, or
● Administering the Auto Return capability on the Main server (see Administering ESS on
page 122).