EasyManuals Logo

Avaya ESS User Manual

Avaya ESS
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
ESS failover examples
Issue 1.1 June 2005 33
The customer is now ready to have the Main server control the configuration (see Figure 8).
Moving the Port Networks back to the control of the Main server can be accomplished by:
Moving each Port Network individually using the get forced-takeover
ipsi-interface port-network [N] (where N is the number of the Port Network)
command,
Moving all Port Networks at one time using the get forced-takeover
ipsi-interface all command, or
Administering the Auto Return capability on the Main server (see Administering ESS on
page 122).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Avaya ESS and is the answer not in the manual?

Avaya ESS Specifications

General IconGeneral
BrandAvaya
ModelESS
CategoryServer
LanguageEnglish

Related product manuals