5
-
35
▶
Land leveling pattern
● The land leveling work may be
performed after crushing soil or
not.
● The vehicle speed can be set fast-
er when performing the land level-
ing work with soil crushed already.
● When working in a wet field, fill
the eld with a sucient amount of
water so that the trace of plowing
cannot be seen.
● The border shown in the figure
should be set a little narrower than
two times of one plowing width.
● Refer to the alternating returning
pattern for other details.
Moving direction
Reverse driving
Finish
A: Border
Start
(15)
(11)
(9)
(13)
A
(14)
(10)
(4)
(5)
(3)
(6)
(2)
(7)
(1)
(8)
(12)
●
Turning:
2024h_3026h.indb 352024h_3026h.indb 35 2020-09-18 오후 6:17:282020-09-18 오후 6:17:28