EasyManua.ls Logo

Bailey Pegasus - SETTING UP UPON ARRIVAL; Mains Power Connection; Gas Supply; Fresh Water

Bailey Pegasus
178 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
SETTING UP UPON ARRIVAL
SETTING UP UPON ARRIVAL
The following are brief, but not exhaustive,
Instructions on how to initially set up your
caravan when you have arrived at your pitch.
Once you have arrived at the destination and
positioned your caravan you should follow the
unhitching and levelling procedure as detailed
within the unhitching section in this manual.
MAINS POWER CONNECTION
Connect the 230v to the caravan by plugging
your pitch lead into the 230v socket situated
in the wall on the outside of your van. Plug the
other end of the pitch lead into the site hook
up. Test the circuit breaker.
GAS SUPPLY
Turn on the gas supply at the cylinder located
within the gas locker. Turn on all the gas taps at
the manifold (located in the kitchen) which are
labelled and serve the individual appliances.
Please bear in mind that if there is still some
air in the supply pipes the ignition of gas
equipment may take longer than usual.
FRESH WATER
Close all taps.
Close drain valve.
Fill your aqua roll/container with fresh water.
Push the electrical end into the socket located
on the outside of your caravan.
Lower the submersible end of the water pump
into your aqua roll/container.
Turn on the pump at your control panel.
The light will illuminate when water is being
pumped.
Open the kitchen hot tap and allow the system
to purge itself of air and is a steady flow of
water is present. This will also fill the water
heater ready for heating.
Close the kitchen tap. Repeat the operation for
washroom.
If an on-board water tank is present
this may fill before water is available
via the taps

Table of Contents

Other manuals for Bailey Pegasus

Related product manuals