4-8 DECS-100 Installation 9287500991 Rev K
POWER
4 CT1 CT2
VOLTAGE
E3 E2 E1
52J 52K 52L 52M
CONTROL CONTROL
52b
S2
5
10
21
10
Utility
Side
A
B
C
CBA
52
10
7
10
7
10
10
8
6
Generator
Side
CTB
+
GEN
PMG
D2881-09
05-10-02
10
OUTPUT
F- F+ 3
6D 7 6U AL 1 AL 2
S1
A B VM VMC
S3
109
54
3
10
FIELD
INPUT
CTB
SENSING
VAR/PF
ADJUST
EXTERNAL
PARALLEL
DECS-100 WITH VOLTAGE MATCHING
ALARM
AUX.
ADJUST
VOLTAGE
MATCHING
B1
B3
BUS
GROUND
GND
NOTES:
11
3
4
5
6
7
8
1
2
9
10
11
Required only for optional Var/PF control. Var/PF is active with
52b open. Var/PF is inactive with 52b closed.
Parallel control and droop active with S2 open, inactive with S2
closed.
S1 (SPDT, spring-return to center-off position) adjusts DECS-100
setpoint.
Normally-open output contact closes for customer alarm or trip.
Analog input voltage between +/- 3 Vdc provides adjustment of
voltage setpoint.
Exter
nal fuses should be Bussman type KTK-10 or equivalent.
Sensing potential transformer is required if line voltage exceeds
660 Vac.
3-phase PMG is shown. For 1-phase PMG, omit B-phase
connection.
Optional voltage matching control input. Voltage matching is
active with S3 closed, inactive with S3 open.
Item not supplied by Basler Electric.
When generator rotation is ACB, the connections shown for CTB
s
hould be reversed.
Figure 4-6. Typical Connections for PMG Application with ABC Rotation and Three-Phase Sensing