EasyManua.ls Logo

Baxi LUNA DUO-TEC+ - BOILER INFORMATION MENU ACCESS; Method to View Boiler Data; BOILER OPERATION AND SYSTEM MAINTENANCE; Boiler Shutdown Procedure

Baxi LUNA DUO-TEC+
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
USER Section (en)
7219620.01 (1-04/15)
154
 Call the Authorised Service Centre.
160
Fan fault Call the Authorised Service Centre.
178


Call the Authorised Service Centre.
270
Overheating exchanger Call the Authorised Service Centre.
317 162
Call the Authorised Service Centre. Call the Authorised Service Centre.
321 163
Call the Authorised Service Centre. Call the Authorised Service Centre.
384 164


for at least 2 seconds.
385 165

Automatic reset at voltages in excess of 175V. If this fault
persists, call the Authorised Service Centre.
431
 Call the Authorised Service Centre.
In the event of a fault, the display backlighting indicates the error code. 5 reset attempts can be performed after which the
boiler shuts down. Wait 15 minutes before attempting to reset the boiler again.
5. BOILER INFORMATION MENU
  to exit.
DESCRIPTION DESCRIPTION
00  06 
01  07 
02  08 
03  09 - 13 Manufacturer information
04


14 
05  15 - 18 Manufacturer information
6. SWITCHING OFF THE BOILER
 

7. FILLING THE SYSTEM
B
A
A 
B Pressure gauge
Take special care when lling the heating system. In particular, open any thermostat
valves in the system, ensure the water enters slowly in order to prevent the formation
of air inside the primary circuit until operating pressure is reached. Lastly, vent any
radiators in the system. BAXI declines all liability for damage deriving from the presence of
air bubbles in the primary exchanger due to the incorrect or imprecise observance of the
above.
The boiler is tted with a hydraulic pressure gauge which prevents the boiler from
working if there is no water.
If pressure drops occur frequently, have the boiler checked by the AUTHORISED
TECHNICAL SERVICE CENTRE.
8. ROUTINE MAINTENANCE INSTRUCTIONS


bis

Table of Contents