HD-7P / HD-7W Four-Post Lifts 68 P/N 5900041 — Rev. M — July 2019
Reviewing the Final Checklist
Make sure these things have been done
before
putting the Lift into service:
• Review the Installation Checklist to make sure all steps have been performed.
• Make sure the Power Unit is getting power from the power source.
• Check the Hydraulic Fluid reservoir on the Power Unit; it must be full of approved Hydraulic Fluid or
automatic transmission fluid.
You can damage the motor by running it without enough
fluid.
• Check the Hydraulic System for leaks.
• Make sure all four Posts are properly anchored, shimmed, level, and stable.
• Make sure all Lifting Cables are properly seated in their Sheaves.
• Make sure all Safety Locks are operating normally.
• Make sure the backup Slack Safety Locks are
not
engaged.
• If it has not been done already, perform an Operational Test of the Lift with a typical Vehicle. Refer
to Performing an Operational Test.
• Make sure a copy of the Installation and Operation Manual is left with the Lift.