EasyManua.ls Logo

Binder ED 260 - User Manual

Default Icon
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Issue 02/2022 Art. No. 7001-0292
Operating Manual
BD (E3.1)
|
Incubators
Avantgarde.Line with natural convection
BF (E3.1)
|
Incubators
Avantgarde.Line with forced convection
ED (E3.1)
|
Drying and heating ovens
Avantgarde.Line with natural convection
FD (E3.1)
|
Drying and heating ovens
Avantgarde.Line with forced convection
FED (E3.1)
|
Drying and heating ovens
Avantgarde.Line with forced convection
and enhanced timer functions
with microprocessor temperature controller
Model Model version Art. No. Model Model version Art. No.
BD 56
BD056-230V 9010/ 9110-0323
ED 260
ED260-230V 9010/ 9110-0339
BD056UL-120V 9010/ 9110-0324 ED260UL-240V 9010/ 9110-0340
BD 115
BD115-230V 9010/ 9110-0325 ED 720 ED720-400V 9010/ 9110-0341
BD115UL-120V 9010/ 9110-0326
FD 56
FD056-230V 9010/ 9110-0303
BD 260
BD260-230V 9010/ 9110-0329 FD056UL-120V 9010/ 9110-0304
BD260UL-120V 9010/ 9110-0330
FD 115
FD115-230V 9010/ 9110-0305
BD 720
BD720-230V 9010/ 9110-0331 FD115UL-120V 9010/ 9110-0306
BD720UL-240V 9010/ 9110-0332
FD 260
FD260-230V 9010/ 9110-0309
BF 56
BF056-230V 9010/ 9110-0313 FD260UL-240V 9010/ 9110-0310
BF056UL-120V 9010/ 9110-0314 FD 720 FD720-400V 9010/ 9110-0311
BF 115
BF115-230V 9010/ 9110-0315
FED 56
FED056-230V 9010/ 9110-0295
BF115UL-120V 9010/ 9110-0316 FED056UL-120V 9010/ 9110-0296
BF 260
BF260-230V 9010/ 9110-0319
FED 115
FED115-230V 9010/ 9110-0293
BF260UL-120V 9010/ 9110-0320 FED115UL-120V 9010/ 9110-0294
BF 720
BF720-230V 9010/ 9110-0321
FED 260
FED260-230V 9010/ 9110-0299
BF720UL-240V 9010/ 9110-0322 FED260UL-240V 9010/ 9110-0300
ED 56
ED056-230V 9010/ 9110-0333
FED 720
FED720-400V 9010/ 9110-0301
ED056UL-120V 9010/ 9110-0334 FED720UL-208V 9010/ 9110-0302
ED 115
ED115-230V 9010/ 9110-0335
ED115UL-120V 9010/ 9110-0336
BINDER GmbH
Address: Post office box 102, 78502 Tuttlingen, Germany Phone: +49 7462 2005 0
Fax: +49 7462 2005 100 Internet: http://www.binder-world.com
E-mail: info@binder-world.com Service Hotline: +49 7462 2005 555
Service Fax: +49 7462 2005 93 555 Service E-Mail: customerservice@binder-world.com
Service Hotline USA: +1 866 885 9794 or +1 631 224 4340 x3
Service Hotline Asia Pacific: +852 390 705 04 or +852 390 705 03
Service Hotline Russia and CIS: +7 495 988 15 16

Table of Contents

Other manuals for Binder ED 260

Questions and Answers

  • O
    oliverjustinAug 20, 2025
    What to do if Binder ED 260 Laboratory Equipment chamber has no function?
    • K
      Katie GoodwinAug 20, 2025
      First, check the connection to the power supply. If that's not the issue, the overtemperature protective device class 1 might have turned off the chamber. Disconnect the chamber from the power supply for at least 10 seconds and let it cool down. If the device responds again, further assistance is needed.
  • J
    Jason OrtizAug 22, 2025
    Why is the set-point temperature not reached in my Binder ED 260 Laboratory Equipment after the specified time?
    • S
      Sheila SmithAug 22, 2025
      Several factors could be the reason. Make sure the chamber door is completely closed and that the door gasket isn't defective (replace if needed). The controller may also need calibration and adjustment. Finally, verify the power supply for the correct voltage.
  • B
    Bobby DoyleAug 25, 2025
    What to do if Binder ED 260 chamber doesn’t heat up but the controller display is working?
    • G
      George NixonAug 25, 2025
      The timer might have run off. Try re-programming the timer or turning it off.
  • G
    Glenda BarronAug 26, 2025
    Why is my Binder ED 260 chamber heating permanently and not holding the set-point?
    • S
      Scott JimenezAug 26, 2025
      The controller may not be adjusted, so calibrate and adjust it. If the issue persists, the controller might be defective and further assistance is needed.
  • J
    Janet MooreAug 27, 2025
    What to do if my ED, FD, or FED Binder ED 260 chamber has no function and shows the alarm message “!TLim”?
    • G
      greenjaredAug 27, 2025
      The safety device class 2 has likely turned off the chamber. Allow the chamber to cool down. Check the temperature set-point and the settings of the safety device class 2. If appropriate, select a suitable limit value. If the issue persists, further assistance is needed.
  • T
    Timothy BentleyAug 29, 2025
    What to do if my Binder ED 260 chamber has no function?
    • M
      Mary CarrAug 29, 2025
      First, check the connection to the power supply. If the overtemperature protective device class 1 has turned off the chamber, disconnect the chamber from the power supply for at least 10 seconds and let it cool down. If the device responds again, further assistance is needed.
  • S
    stacyramseyAug 31, 2025
    What to do if my ED, FD, FED Binder ED 260 chamber has no function and shows alarm message “!TLim”?
    • T
      timothyramosAug 31, 2025
      This alarm indicates that safety device class 2 has turned off the chamber. Allow the chamber to cool down. Check the settings of the temperature set-point and the safety device class 2, and select a suitable limit value if needed.
  • E
    Edward OrtizSep 2, 2025
    What to do if my Binder Laboratory Equipment chamber doesn’t heat up and there is no heating icon in the display, but controller display is working?
    • M
      Mr. Jon RodriguezSep 2, 2025
      The timer may have run off. Try re-programming the timer or turn it off.
  • M
    Miguel McgeeSep 4, 2025
    What to do if my BD, BF Binder ED 260 Laboratory Equipment displays alarm message “!TProt”?
    • V
      Vanessa StoneSep 4, 2025
      The alarm message “!TProt” indicates that safety device class 3.1 has responded. Check the settings of the temperature set-point and of the safety device class 3.1.
  • J
    Jack JosephSep 6, 2025
    What to do if my Binder ED 260 Laboratory Equipment chamber is heating permanently, and the set-point is not held?
    • P
      Philip PotterSep 6, 2025
      The controller may not be adjusted correctly. Calibrate and adjust the controller.

Summary

Safety and Operation Basics

Personnel, Manual, and General Safety

Requirement for qualified personnel, manual usage, general safety instructions, intended use, and residual risks.

Chamber Description and Controls

Chamber overview, components, and controller operations including settings.

Installation and Setup

Unpacking, lifting, transportation, site requirements, and electrical connection.

Start Up and Basic Operation

Initial steps to power on, load, and operate the chamber.

Advanced Functions

Overtemperature Protection and Alarms

Explanation of protective devices, safety controllers, and alarm handling procedures.

Timer and Ramp Functions

Guide to using timer functions and programming temperature ramps.

Data Recording and Network Configuration

How to record data via USB and configure network settings.

Maintenance, Troubleshooting, and Disposal

Cleaning, Decontamination, and Maintenance

Instructions for cleaning, decontaminating, and performing regular maintenance.

Troubleshooting and Returns

Guide to resolve common faults and procedures for returning equipment.

Disposal Procedures

Guidelines for proper disposal of the chamber according to regulations.

Technical Data and Compliance

Technical Specifications and Dimensions

Detailed technical data, dimensions, and specifications for various models.

Certificates of Conformity

Official EU and UL compliance statements and conformity certificates.

Safety and Health Declarations

Forms for declaring absence of hazardous substances and requesting return authorization.

Binder ED 260 Specifications

General IconGeneral
BrandBinder
ModelED 260
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals