EasyManua.ls Logo

Binder FP 53 - User Manual

Binder FP 53
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Issue 07/2017 Art. No. 7001-0130
Operating Manual
FP – Drying and heating ovens
with forced convection and program functions
with microprocessor program controller RD3
Model Model version Art. No.
FP 53 (E1.1) FP053-230V 9010-0153, 9110-0153
FP 53-UL (E1.1) FP053UL-120V 9010-0175, 9110-0175
FP 115 (E1.1) FP115-230V 9010-0255, 9110-0255
FP 115-UL (E1.1) FP115UL-120V 9010-0262, 9110-0262
FP 240 (E1.1) FP240-230V 9010-0263, 9110-0263
FP 240-UL (E1.1) FP240UL-120V 9010-0264, 9110-0264
FP 400 (E1.1) FP400-230V 9010-0265, 9110-0265
FP 400-UL (E1.1) FP400UL-120V 9010-0266, 9110-0266
FP 720 (E1.1) FP720-230V 9010-0267, 9110-0267
FP 720-UL (E1.1) FP720UL-120V 9010-0268, 9110-0268
BINDER GmbH
Address: Post office box 102, 78502 Tuttlingen, Germany Phone: +49 7462 2005 0
Fax: +49 7462 2005 100 Internet: http://www.binder-world.com
E-mail: info@binder-world.com Service Hotline: +49 7462 2005 555
Service Fax: +49 7462 2005 93 555 Service E-Mail: service@binder-world.com
Service Hotline USA: +1 866 885 9794 or +1 631 224 4340 x3
Service Hotline Asia Pacific: +852 390 705 04 or +852 390 705 03
Service Hotline Russia and CIS: +7 495 988 15 16

Table of Contents

Questions and Answers

  • J
    Jacqueline BrownAug 17, 2025
    What to do if the set-point temperature is not reached in my Binder FP 53 Laboratory Equipment?
    • E
      Eduardo MunozAug 17, 2025
      If the set-point temperature isn't reached after the specified time, there might be a few reasons. First, make sure the chamber door is completely closed. If it is, inspect the door gasket for any defects and replace it if necessary. Also, the controller might need adjustment; try calibrating it.
  • U
    uspearsAug 20, 2025
    What causes my Binder FP 53 Laboratory Equipment chamber to heat permanently and not hold the set-point?
    • R
      Rebecca KingAug 20, 2025
      If your chamber is heating permanently and not holding the set-point, calibrate and adjust the controller. For other potential causes, contact Binder service.
  • M
    Michael RossAug 22, 2025
    Why are there deviations from the indicated heating-up times in my Binder Laboratory Equipment?
    • D
      Diana GuerreroAug 22, 2025
      Deviations from the indicated heating-up times can occur if the oven is fully loaded. Try charging the oven with less material or consider allowing longer heating-up times.
  • M
    Mark SparksAug 25, 2025
    Why is my Binder FP 53 chamber permanently turned off?
    • E
      Emily HallAug 26, 2025
      If the chamber is permanently turned off, first check the connection to the power supply. Ensure the correct voltage (115V or 230V) is being supplied. Also, check the chamber fuse and replace it if needed. If the fuse responds again, contact Binder service.
  • A
    amy45Aug 27, 2025
    What to do if the red indicator lamp is lit and my Binder Laboratory Equipment chamber is permanently turned off?
    • T
      taylordianaAug 28, 2025
      If the red indicator lamp of safety device class 2 is lit and the chamber is permanently turned off, let the oven cool down and then press the RESET button. Check the temperature set-point and the setting of the safety device, and select a suitable limit value if appropriate.
  • R
    Russell WalkerAug 30, 2025
    What to do if my Binder FP 53 Laboratory Equipment chamber doesn’t heat up, the LED is not lit, but the controller display is working?
    • D
      Derek TuckerAug 30, 2025
      If the chamber doesn’t heat up, the LED is not lit, and the controller display is working, contact Binder service.
  • D
    Debbie FloresSep 1, 2025
    What to do if my Binder FP 53 chamber doesn’t heat up, but the LED is lit?
    • J
      James ThomasSep 2, 2025
      If the chamber doesn’t heat up but the LED is lit, contact Binder service.
  • J
    Jorge SheltonSep 4, 2025
    Why is the program duration longer than programmed on my Binder FP 53 Laboratory Equipment?
    • V
      Virginia LeonSep 4, 2025
      If the program duration is longer than programmed, it may be due to inappropriate tolerances. For rapid transition phases, do NOT program tolerance limits to allow maximum heating speed.
  • S
    showardSep 6, 2025
    How to fix ramp temperature transitions that are only realized as steps in my Binder FP 53?
    • D
      David GarciaSep 7, 2025
      If ramp temperature transitions are only realized as steps, set the set-point programming type to “Ramp” in the User level.
  • S
    Susan KellerSep 9, 2025
    Why does my Binder FP 53 Laboratory Equipment program stop one section too early?
    • R
      Robert SheltonSep 9, 2025
      If the program stops one section too early, the program line might be incomplete. Define the end value of the desired cycle by adding an additional section with a section time of at least one minute when programming.

Summary

Safety Information

1.5 General Installation and Operation Safety

Crucial safety guidelines for installing, operating, and maintaining the chamber.

1.6 Intended Use Guidelines

Defines approved applications and operational limits for the equipment.

Delivery, Transportation, Storage & Installation

3.2 Safe Lifting and Transportation

Procedures and precautions for safely moving and transporting the chamber.

3.4 Installation Site & Ambient Conditions

Specifies requirements for the installation location and environmental conditions.

Equipment Installation

4.1 Electrical Connection Procedures

Steps for connecting the chamber to the power supply, including voltage checks.

Fixed Value Entry Mode

Fixed Value Entry Principles

Explains how to enter set-points for temperature and fan speed in fixed value mode.

Inputting Set-Points

Step-by-step guide for entering temperature and fan speed values.

Week Program Editor

Program Editor

8.1 Set-Point Ramp vs. Step Programming

Explains selection between gradual (ramp) and sudden (step) temperature transitions.

8.2 Entering Program Set-Points

Guides on entering temperature, time, and fan speed for program sections.

Program Start Level

Starting and Terminating Programs

Steps for selecting, starting, and terminating programmed sequences.

User Level Settings

10.3 Program & Timer Configuration

Settings for program types, section duration, ramp/step, tolerance, and week timer.

Week Program Editor Example

11.3 Detailed Programming Steps

Provides a step-by-step guide to implementing the weekly temperature program.

Program Editor Example

Failure Behavior

13.2 Alarm Message Interpretation

Explains displayed alarm messages and buzzer functions.

Temperature Safety Devices

14.1 Class 2 Safety Device

Details on the function, operation, and checking of the Class 2 safety device.

Maintenance, Cleaning & Service

16.2 Cleaning and Decontamination

Procedures for cleaning chamber interior, exterior, and decontamination.

Troubleshooting Guide

Heating System Faults

Addresses issues related to chamber heating and temperature control.

Controller Malfunctions

Solutions for problems with the program controller and its functions.

Technical Specifications

19.4 Detailed Technical Data

Comprehensive table of chamber dimensions, performance, and electrical specifications.

Contamination Clearance Certificate

Binder FP 53 Specifications

General IconGeneral
BrandBinder
ModelFP 53
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals