EasyManua.ls Logo

BIO RAD S3 - Page 106

BIO RAD S3
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S3 Cell Sorter Instruction Manual96 |
6. If yes, assign date and time for automatic startup procedure to run.
7. Click the checkmark button to proceed.
8. Replace the DI water and sheath fluid containers with at least 1 L of decontamination
solution (Figure 112).
9. Empty waste container and replace.
10. Click the checkmark button to proceed.
The system will drain the internal sheath reservoirs into the waste container (Figure 113).
The system will directly prime the fluidics with the decontamination fluid (Figure 114).
Fig. 113. Decontamination window
while draining internal system.
Fig. 114. Decontamination window while
priming system.
Fig. 115. Decontamination window while priming rinse filter and nozzle path.
Fig. 112. Decontamination instructions to prepare the system.

Related product manuals