S3 Cell Sorter Instruction Manual96 |
6. If yes, assign date and time for automatic startup procedure to run.
7. Click the checkmark button to proceed.
8. Replace the DI water and sheath fluid containers with at least 1 L of decontamination
solution (Figure 112).
9. Empty waste container and replace.
10. Click the checkmark button to proceed.
The system will drain the internal sheath reservoirs into the waste container (Figure 113).
The system will directly prime the fluidics with the decontamination fluid (Figure 114).
Fig. 113. Decontamination window
while draining internal system.
Fig. 114. Decontamination window while
priming system.
Fig. 115. Decontamination window while priming rinse filter and nozzle path.
Fig. 112. Decontamination instructions to prepare the system.