Putting into operation
10
3 Putting into operation
3.1 Preparing for use
3.2 Requirements for place of operation
For safe and trouble free operation of the appliance it must be placed on a location that
suits the following conditions:
Place the appliance on a fixed horizontal, heat resistant and water-resistant
surface that is strong enough to hold it. Distance to rear wall at least 5 cm
(Figure 2).
The power plug must be easily accessible after the appliance is installed and
can be easily pulled out in case of emergency.
In order to assume a fault-free operation, the ambient temperature should be
between 10° C and 38° C with a maximum rH of 75%.
The appliance is not designed to cool down kegs.
Therefore please make sure that the kegs are pre-
cooled in a refrigerator or cold room for at least 16 -
24 hours before use (Figure 1). Please therefore
ensure that the required kegs are stored in corres-
ponding cooling units or cold stores in good time prior
to use.
NOTE
Only genuine disposable kegs made by Blade
®
can be used.
This guarantees the consistent quality of the beer.
►
■
■
■
NOTE
To eliminate the risk of the appliance or the keg overheating, the appliance
must never be exposed to direct sunlight during operation (Figure 3).
►