EasyManua.ls Logo

Blade 9930 - Putting Into Operation; Preparing the Keg for Use; Requirements for Place of Operation

Blade 9930
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into operation
10
3 Putting into operation
3.1 Preparing for use
3.2 Requirements for place of operation
For safe and trouble free operation of the appliance it must be placed on a location that
suits the following conditions:
Place the appliance on a fixed horizontal, heat resistant and water-resistant
surface that is strong enough to hold it. Distance to rear wall at least 5 cm
(Figure 2).
The power plug must be easily accessible after the appliance is installed and
can be easily pulled out in case of emergency.
In order to assume a fault-free operation, the ambient temperature should be
between 10° C and 38° C with a maximum rH of 75%.
The appliance is not designed to cool down kegs.
Therefore please make sure that the kegs are pre-
cooled in a refrigerator or cold room for at least 16 -
24 hours before use (Figure 1). Please therefore
ensure that the required kegs are stored in corres-
ponding cooling units or cold stores in good time prior
to use.
NOTE
Only genuine disposable kegs made by Blade
®
can be used.
This guarantees the consistent quality of the beer.
16 - 24 h
0
°
<
<
4
°
C
1
>5 cm
2
3
NOTE
To eliminate the risk of the appliance or the keg overheating, the appliance
must never be exposed to direct sunlight during operation (Figure 3).

Other manuals for Blade 9930