EasyManua.ls Logo

Blade 9930 - Keg Preparation Steps

Blade 9930
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.7 Preparing the keg
The keg must now be prepared for connection. Please perform the following steps:
Use only pre-cooled kegs stored in a refrigerator or cold room (Figure 12).
Flip down the tap cover (K) (Figure 13).
Remove the pre-cooled keg (J) from the packaging (Figure 14).
Fully unwind the beer tube (L) with inline dispensing valve (M) of the keg (J)
(Figure 15).
Use your thumb to press the orange button into the retainer of the keg until you
hear an audible click. Only once this step has been performed the keg is ready
to be tapped (Figure 16).
Flip the keg upside down (Figure 17).
12
1
13
1
14
1
15
1
click!
16
1
180°
17
1
NOTE
Perform this assembly step prior to connecting the keg, as a certain amount
of beer may escape in the subsequent process.
Putting into operation
13

Other manuals for Blade 9930