EN 2
/
INSTALLING YOUR APPLIANCE
PYROLYSIS
OVENS:
220-240 V
~
Single
phase
line
Sing
le
phase 20A Meter
220-240V
~
50Hz
16A fuse
or differential
circuit breaker
Minimum cord size: 3G 1.5mm
2
P
ower
supply cable
length
1.50
m approx.
•
ELECTRICAL
CONNECTION
The appliance must be fitted correctly to
guarantee
electrical
safety.
The electrical connections are made before the appliance is
installed
in its housing.
Ensure
that:
-
the
electrical installation has sufficient
voltage,
-
the
electrical wires are
in good condition,
-
t
he diameter of the wires
com
plies with the installation
requirements.
During
maint
e
nance operations, the appliance
mus
t be
unplugged
from the
electrical
grid.
Fuses
must be
switched
off or
removed.