COMMISSIONING CHECK LIST
Site
□ Return panels and covers to their correct position and check that they are well secured.
□ Ensure all service caps are fitted and correctly tightened.
□ Attach the electrical wires and pipes to the wall with clamps.
□ Check all the operations of the air-conditioner. Follow the operating manual for
instruction.
Indoor unit
□ Is the condensate drain fixed securely and has it been tested?
□ Are all ducting connections secured and free from air leaks?
□ Does the unit operate correctly?
Outdoor Unit
□ Check for any abnormal noise or vibrations during operation of the air conditioner.
□ Check that the noise, condensate drainage or air flow does not disturb the neighbors.
□ Run the air-conditioner for both cooling and heating and check operation.
Communications
□ Check the low voltage communication
is transmitting instructions correctly.
□ Check the RF communication
between the portable remote control
is consistent in all areas of the air
conditioned space.
□ See IMPORTANT NOTE for
limitations with RF communications.
Where communications are limited, a
LV control option will have to be fitted.
IMPORTANT NOTE
To reduce the risk of possible RF
interference, do not locate your RF
control near any electrical equipment
e.g. TV’s computers, fridges,
telecommunications and HI FI
equipment or close to metal objects or
window frames.
Other RF devices within your home
can also cause interference such
wireless door bells, gate or door
openers, or perhaps baby monitors &
intercoms. Such interference can
impede the operation of your
appliance.
Ensure the RF control unit is not
exposed to excessive heat, humidity,
moisture or dam