EasyManuals Logo

Bosch CS LD 1.0 User Manual

Bosch CS LD 1.0
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
F 002 DG9 H12 | Bosch Automotive Service Solutions GmbH 2021-04-08
46 | CS LD 1.0 | Maintenance
en |
Fig. 18: Charging Leak detector
1. Charging port
ii Always use a locally approved
5V DC charger with an output
of at least 1.0A.
It is also possible to use a 12V DC
power source if the USB adapter
outputs a minimum 1.0A.
With the leak detector off and
the charger connected, the
screen will display charging
status as shown in Fig. 20. Char-
ge the leak detector until the
display shows 100%.
Charging time to full capacity is
approximately 3 hours.
50%
Fig. 19: Charging status icon (power off)
7.4.3 Operating the leak
detector with the charger
connected
It is possible to operate the
leak detector with the charger
connected.
Connect the charger as descri-
bed in section 7.4.2 and turn
on the leak detector.
With the leak detector on and
the charger connected the dis-
play will indicate charging and
progress with the lightning bolt
symbol in the upper right corner
of the screen, see Fig. 21.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bosch CS LD 1.0 and is the answer not in the manual?

Bosch CS LD 1.0 Specifications

General IconGeneral
BrandBosch
ModelCS LD 1.0
CategorySecurity Sensors
LanguageEnglish

Related product manuals