EasyManua.ls Logo

Breas PV 102+ - Internal Inspection; Opening the Casing; Cleaning the Inside of the Machine; Inspecting the Internal Wiring

Breas PV 102+
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE SERVICE INSTRUCTIONS PV 101+/PV 102+ Service Manual
2–6 BREAS MEDICAL Doc. No. 003259 En Issue: X-1
2.5 Internal inspection
Disconnect the power supply before removing the casing of the machine.
2.5.1 Opening the casing
For instructions, see section 3.2, “Removing and reassembling the upper casing”.
2.5.2 Cleaning the inside of the machine
Remove any dust or dirt that has collected in the machine.
2.5.3 Inspecting the internal wiring
Inspect all wiring and the connectors for damage. Make sure that no wires or
cables are pinched.
2.5.4 Securing the components
Make sure that all the internal components, such as the motor unit, the circuit
boards, the connectors and so on, are properly secured.
2.5.5 Checking the power supply
1 Check that the power inlet socket is undamaged and that it is properly fastened.
2 Make sure the power board is properly fastened.
3 Check the wiring to and from the power board.
2.5.6 Checking the electrical safety values
For instructions, see section 7.5, “Electrical safety measurements”.
2.5.7 Calibrating the pressure sensor
For instructions, see section 4.3, “Calibrating the pressure sensor”.
2.5.8 Calibrating the flow sensor
For instructions, see section 4.5, “Calibrating the flow sensor”.
2.5.9 Calibrating the high pressure limit
For instructions, see section 4.6, “Calibrating the high pressure limit”.
2.5.10 Reassembling the casing
For instructions, see section 3.2, “Removing and reassembling the upper casing”.

Table of Contents

Related product manuals