EasyManua.ls Logo

Broaster 1800 - 3 Installation Inspection

Broaster 1800
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - INSTALLATION INSPECTION
3-1
Before operating unit, be sure installation
meets all requirements in the Installation
Manual provided with your unit.
Follow cleaning instruc-
tions as outlined in this
manual before operating the first time.
See section 9 - CLEANING.
• A remote circuit breaker or fuse should
be installed in the main power supply
located in a path of exit and clearly iden-
tified.
• To avoid splashing of hot liquid, unit
must be restrained to prevent tipping.
This can be done by installing the unit in
a battery of appliances, in an alcove or
with adequate ties.
•See Safety Relief Valve under GET-
TING TO KNOW YOUR BROASTER
®
PRESSURE FRYER. DO NOT install unit
where traffic area’s are on either side or
in back of unit.
1800GH:
Electrical Grounding
Instructions - The Model
1800GH is equipped with a three-prong
(grounding) plug for your protection
against shock hazard and should be
plugged directly into a properly
grounded three-prong receptacle. DO
NOT
cut or remove grounding prong
from this plug.
A gas shutoff valve,
installed in gas supply
line, should be located in a path of exit
and clearly identified.
Contact your local Broaster Company rep-
resentative for converting from one type of
gas to another.
broaster.com Manual #17269 8/13 rev 5/14