CHECKLIST—INSTALLATION
LOAD CALCULATION
________ Heating Load (Btuh)
________ Cooling Load (Btuh)
________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
________ Unconfined Space
________ Confined Space
VENTING
________ NFGC (United States)
________ NSCNGPIC (Canada)
________ Local Codes
________ 1/4-in. Upward Slope
________ Joints Secure
________ See Attached Vent Table Instructions
CHECKLIST—START-UP
________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
________ Temperature Rise Adjusted
________ Thermostat Anticipator Setting Adjusted or
________ Thermostat Cycle Rate (3 cycles per Hr) Selected
CHECK SAFETY CONTROLS OPERATION
________ Primary Limit
________ Pressure Switches
________ Draft Safeguard Switch
________ Auxiliary Limit Switch(es)
THERMOSTATS
________ Manufacturer
________ Model Number
—26—