5
Packaging and transportation
Logamax plus GB162- 80/100 kW - Subject to modifications resulting from technical improvements!
12
5 Packaging and transportation
5.1 Scope of delivery
The boiler is delivered factory-assembled.
• When receiving the delivery, check if the packaging is
intact.
• Check that all items are included in the delivery.
Fig. 4 Items supplied with unit
5.2 Transporting the boiler
B Always lift and carry the boiler with 2 people as shown
in (fig. 5),or use a hand truck or special equipment.
Fig. 5 Lift and carry the boiler correctly
Nr. Parts Qty. Packaging
1 Boiler with casing 1 1 box
2 Wall bracket 1
3 Condensate trap with hose 1
4 Technical documents set 1
5 Supply and return union nuts with
sealing rings
1
6 Screws and plugs for wall bracket 2
7 Union nut for gas connection 1
8 DHW sensor 1
9 Pump group 1 1 box
10 Low loss header
(single installation only)
11box
Tab. 3 Items supplied with GB162-80 kW/100 kW
0
1
2
3
4
1
2
4
8
3
6
7
5
9
10
6720645916-04.1TD
CAUTION: The boiler may be damaged
when it is improperly secured.
B Only transport the boiler using the right
transportation equipment, such as a hand
truck with a fastening belt or special
equipment for maneuvering steps.
B During transportation the boiler must be
secured on the transportation equipment
to prevent it from falling off.
B Protect all parts against impacts if they
are to be transported.
B Observe the transportation markings on
the packaging.
CAUTION: The unpacked boiler may be
damaged when not protected against
contamination
B Leave the protective covers on the
connections.
B Cover the flue gas connections at the top
of the boiler with plastic film
CAUTION: Damage to the unit by lifting or
carrying incorrectly.
B Do not hold the boiler by the door
covering the control panel (fig. 6)
6 720 646157-05.1TD