8
*
Important: When installing the
boiler, the wooden pallet onto
whichtheboiler isplacedmust
be removed by unscrewing the
bolted connecons using at
ringwrenchS13.
Diagram 3
Model A B C D kg
20 kW 850 1200 120 1360 490
30kW 850 1260 120 1470 572
5. DELIVERY OF THE BOILER
•Inspect the integrity of the packaging
upondelivery.
•Check whether all components have
been delivered to you. Boiler scope of
deliveryincludes:
1)Boilerbodywithboilerdoors
2)Safetyvalve3bar.
3)Ashpan
4)Cleaningbrushforuepipes
5)CockG½”
6)Installaonandoperaonmanual
7)ServicebookletandWarrantycard
If any of the above items are missing,
contactyoursupplier.
•Youmustremovethepolystyreneblocks
placedinthecombusonchamberprior
topungtheboilerintooperaon.
6. ASSEMBLY OF THE HEATING BOILER
*
The assembly, installaon and
set-up of the boiler must be
performed by a technician
authorizedforsuchoperaons.
Installermustindicatetotheuser
of the installaon the minimum
clearances from ammable
materials and liquids.
6.1. Requirements:
-Boilerroommustbefrost-proof;
-Boiler room must allow for connuous
access of air necessary to maintain
combuson;
-Boilersmustnotbeplacedininhabitable
rooms;
-All boiler rooms must have correctly
calculatedventdependingontheboiler
output.Theventmustbeprotectedby
meansofanetorgrate.
Thesizeoftheventiscalculatedaccording
totheformula:
А=6,02Q-where:
А–areaoftheventincm,
Q–boileroutputinkW
- Removethepackagingwithoutpollung
theenvironment;
- Observe building supervision
instrucons, in parcular the exisng
Ordinance on combuson devices and
storage of combuson materials, on
building requirements applicable to
installaonsitesandonvenlaon;
-The boiler must be placed on a
foundaonwhosesurfaceareaislarger
than the base of the heang boiler
accordingtodiagram1;
-Theboilermustbeplacedinaposion