EasyManua.ls Logo

BYD e3 2019 - Page 96

BYD e3 2019
219 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
96 4-1 Charging Instructions
plug in the designated position of the charging pile/box;
● If the 7-pin to 7-pin equipment is used for charging, sort and place it
properly.
WARNING
● Do not let the 7-pin to 7-pin equipment fall from height. Do not move the
charging equipment by directly pulling the cable. Handle it gently and put it
at a cool and shaded place after use.
DC charging through charging pile
1. Description of equipment
■ The AC charging piles in public places can be used to charge the
vehicle. Generally, AC charging piles are installed at designated
charging stations.
■ Specifications of equipment: Please refer to relevant description of
the charging pile.
■ Charging time: Please see the charging time prompt displayed on the
combination instrument.
2. Guidance on charging operation
DC charging can be performed by connecting the vehicle to a DC charging pile
through the charging plug of the DC charging pile.
Instant charging method:
■ Before charging, make sure the
vehicle power is in the OFF mode.
■ Opening the charging port cap and
charging port protection cover:
● Press the red area shown in
the figure to open the charging
port cap.
■ Connecting vehicle charging port:
● Connect the charging plug of the charging pile to the charging port of
the vehicle and lock it securely.
■ Follow the steps of charging equipment instructions to start charging.
■ The charging plug connected indicator on the combination instrument
will illuminate.
■ In the charging process, relevant charging parameters and charging

Table of Contents