The data and information shown in this manual may be changed by CAME cancelli automatici s.p.a. at any time without prior warning.
14
ENGLISH
7.4 Extraordinary maintenance
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
The following table is for logging any extraordinary maintenance, repairs or upgrades performed by licensed, specia-
lised firms.
N.B.: only entrust licensed, specialised firms to perform any extraordinary maintenance.
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed______________________________________________________________________________________
________________________________________________________________________________________________
Extraordinary maintenance log
Date Notes Segnature
Periodic maintenance log kept by the user (every 6 months)
7.3 Maintenance