6. Connect the CS110 power cable to the CS110 POWER connector.
7. Route the cable down the pole and into the enclosure conduit.
8. Connect the black and clear wire to ⏚ terminals on the PS150 or CH150 and red wire to the
+12 terminal.
9. Use cable ties to secure the cable to the pole.
10. Connect the green ground wire from the ground lug at the bottom of the enclosure to a ⏚
terminal on the PS150 or CH150.
J.3 Site calibration cautions
The greater the distance between the calibrator and the DUC, the greater the potential for error
in the resulting C
site
multiplier. Figure J-3 (p. 77) show the potential for error at separation
distances of 200 m, 15 m, 30 m and 10 m. An e
field
ratio (DUC/Calibrator) of 0.9 or 1.1 means that
the regression derived C
site
multiplier and resulting e
fields
will be off by 10%.