EasyManua.ls Logo

Carrier 100 Series - Check List

Carrier 100 Series
18 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.
Check
primary
limit
control.
This
control
shuts
off
the
combustion
control
system
and
energizes
the
circulating-air
blower
motor
if
the
furnace
overheats.
The
preferred
method
of
checking
the
limit
control
is
to
gradually
block
off
the
return
air
after
the
furnace
has
been
operating
for
a
period
of
at
least
5
minutes.
As
soon
as
the
limit
has
shut
off
the
burners,
the
return-air
opening
should
be
unblocked.
By
using
this
method
to
check
the
limit
control,
it
can
be
established
that
the
limit
is
functioning
properly
and
will
operate
if
there
is
a
motor
failure.
2.
Check
draft
safeguard
switch.
(Category
I
vent
installation.)
The
purpose
of
this
control
is
to
permit
the
safe
shutdown
of
the
furnace
during
certain
blocked
vent,
conditions.
a.
D
i
sconnect
power
to
furnace
and
remove
vent
connector
from
furnace
outlet
collar.
Be
sure
to
allow
time
for
vent
pipe
to
cool
down
before
removing.
Fig,
15—Amp
Draw
Check
With
Ammeter
b.
Restore
power
to
furnace
and
set
room
thermostat
above
room
temperature.
c.
After
normal
start-up,
allow
furnace
to
operate
for
2
minutes,
then
block
flue
outlet
100
percent.
Furnace
should
cycle
off
within
2
minutes.
d.
Remove
blockage
and
reconnect
vent
pipe
to
furnace
outlet
collar.
e.
Wait
5
minutes
and
then
reset
draft
safeguard
switch.
3.
C
heck
flow-sensing
switch.
This
control
proves
operation
of
draft
inducer
blower.
a.
Turn
off
115-v
power
to
furnace.
b.
Remove
control
door
and
disconnect
inducer
motor
lead
wires
from
wire
harness.
c.
Turn
on
115-v
power
to
furnace.
d.
Close
thermostat
switch
as
if
making
normal
furnace
start.
If
the
hot
surface
ignitor
does
not
glow
within
several
minutes
and
control
flashes
code
32,
then
the
flow-sensing
switch
is
functioning
properly.
e.
Turn
off
115-v
power
to
furnace.
f.
Reconnect
inducer
motor
wires,
replace
control
door,
and
turn
on
115-v
power.
CHECK
LIST
1.
Put
away
tools,
instruments,
and
clean
up
debris.
2.
Check
SWl
through
SW4
after
completing
installation
to
ensure
desired
settings
for
thermostat
type
(SWl
and
SW2)
and
blower
off
delay
(SW3
and
SW4).
3.
Verify
manual
reset
switches
have
continuity.
4.
Ensure
blower
and
control
access
doors
are
properly
installed.
5.
Cycle
test
furnace
with
room
thermostat.
6.
Check
operation
of
accessories
per
manufacturer’s
instruc¬
tions.
7.
Review
User’s
Manual
with
owner.
8.
Leave
literature
packet
near
furnace.
Copyright
1993
CARRIER
Corp.
7310
W.
Morris
St.
Indianapolis.
IN
46231
15090c
Manufacturer
reserves
the
right
to
discontinue,
or
change
at
any
time,
specifications
or
designs
without
notice
and
without
incurring
obligations.
PC
101
Catalog
No.
565-896
Printed
in
U.S.A.
Form
58TUA-1SI
Pg
18
8-93
Replaces:
New
Book
1
4
Tab
6a
8a

Related product manuals