EasyManua.ls Logo

Carrier 59SC2A - Page 14

Carrier 59SC2A
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59SC2A
front
pressure
switch
and
discard.
A
new
tube
is
shipped
in
the
loose
parts
bag.
Remove
relief
tube
from
relief
3
Remove
tube
from
relief
port.
port
on
condensate
trap.
(4)
Remove
pressure
switch
tube
from
Remove
the
screw
that
secures
the
trap
to
the
collector
box
and
remove
trap.
Loosen
clamp
on
inlet
(1
and
2
Stage
Units)
Remove
middle
and
bottom
to
vent
elbow.
plugs.
DO
NOT
DISCARD.
Unconverted
Factory
Configuration
as
Viewed
in
the
Downflow
Orientation
Connect
the
new
pressure
switch
tube
from
Loose
Parts
bag
to
port
on front
pressure
switch.
Route
tube
through
inducer
stand-—offs
to
adjust
position
of
the
tube.
(9)
Trim
excess
tube.
Connect
pressure
switch
tube
to
port
on
collector
box.
8
Install
the
two
plugs
previously
removed
on
the
open
ports
of
the
collector
box.
Attach
condensate
trap
with
screw
to
collector
box.
Connect
relief
tube
to
port
on
collector
box.
Rotate
elbow
to
desired
position
and
tighten
clamp
to
3
Connect
relief
tube
to
relief
port
on
condensate
trap.
5
2.
(1
and
2
Stage
Units)
Align
condensate
trap
over
middie
and
bottom
ports
of
collector
box.
15
lb.-in.
2
Slide
tube
in
stand-offs
to
adjust
length.
Downflow
Trap
Configuration
A11587
Fig.
9
-
Downflow
Trap
Configuration
(Appearance
may
vary)
14

Other manuals for Carrier 59SC2A

Related product manuals