Installing the AppController
   
 
 
 
AppController    CARRIER CORPORATION ©2019  
Installation and Start-up Guide    All rights reserved 
  11 
 
4  Connect the binary output wiring to the screw terminals on the AppController and to the controlled device. 
 
 
 
5  Insert the power screw terminal connector into the AppController's power terminals. 
 
 
 
Wiring devices to the AppController's Rnet port 
The Rnet communicates at a rate of 115 kbps and should be wired in a daisy-chain or hybrid configuration. 
Supports up to  
  10 wireless and/or ZS sensors (5 per control program) 
  One Equipment Touch 
  One TruVu™ ET Display 
 
NOTE ZS sensors, a Wireless Adapter, and an Equipment Touch can share the Rnet, but not SPT sensors. 
 
 
 
Rnet wiring specifications 
NOTE  Use the specified type of wire and cable for maximum signal integrity. 
 
4 conductor, shielded or unshielded, CMP, plenum rated cable 
22 AWG (7x0096) bare copper if Rnet has only sensors 
Low-smoke PVC (or equivalent) 
If shielded, Aluminum/Mylar shield (100% coverage) with TC drain wire, terminated 
at controller