12 215204 Rev. 1
ROUBLESHOOTING
T
4.1-4 Carton Clamp Loads
CL0086.ill
CL0087.ill
Re-clamp
load against
backrest
Check for bent
pads; straighten
or replace
IF FRONT STACK OF
LOAD TILTS OUT:
IF LOWER TIER OF LOAD BRIDGES
DOWN OR SLIDES OUT:
Check for bent
stabilizers;
straighten or
replace
Assure center of
load is between
pad pivot and
backrest
Check for bent
pads; straighten
or replace
Check for worn
lower surfaces,
rotate pads 180
°
and exchange
sides or replace
Re-clamp load
so bottom edge
is even with
bottom of pads
Check
hydraulics
for low
supply
pressure
Add or increase
positive camber
(Contact Cascade
Service)
IMPORTANT: Before adjusting contact pad camber to
solve handling problems, make sure the Clamp is being
used correctly and is not damaged. Use the Trouble-
shooting procedure shown and, if necessary, adjust the
contact pad camber using a Cascade Shim Service Kit.
1
2
3
4
5
1
2
3
4