10
l To AVOID damaging gas, power or other underground utility lines,
contact underground utility locating companies BEFORE digging more
than 18 inches (46 cm) deep.
l DO NOT touch the heater when switch is on, heater may be hot.
l To prevent damage to the operator or gate, DO NOT drive the limit
(nuts) actuators on the shaft past their normal positions.
Step 1 Install the Operator
Check the national and local building codes before installation.
Install With Adjustable Rails
1. Locate and anchor two posts made of 3" (7.6 cm) outer diameter
heavy walled pipe. Posts should be parallel and square to the gate.
2. Locate electrical conduit, as required, prior to pouring concrete.
3. Slide the four 3" (7.6 cm) clamps (provided) into the rails on the
sides of the operator.
4. Slide the posts into the clamps and tighten the screws on the clamps
to secure the operator.