EasyManua.ls Logo

Cirrus DESIGN SR22 - Page 470

Cirrus DESIGN SR22
484 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 of 6 P/N 13772-143
Section 9 Cirrus Design
Supplements SR22 / SR22T
8. Reduce loads as required for flight conditions:
a. Air Conditioning and Fan ..................................................OFF
b. Convenience Outlet ................................Disconnect appliance
c. Audio Panel .......................................................................OFF
COM 1 will be supplied to pilot’s headset. Communication with
passengers through audio panel will not be available.
d. GPS/COM 2.......................................................................OFF
e. Fuel Pump .........................................................................OFF
except for landing and switching tanks.
f. Panel and Overhead Lights ...............................................OFF
g. Landing Light .....................................................................OFF
• WARNING
Do not shed loads from Avionics Essential, Essential, or
Essential 2 Bus row.
h. Skywatch/TAWS Circuit Breaker...................................... PULL
i. Weather/Stmscpe Circuit Breaker ...................................PULL
j. MFD Circuit Breaker ........................................................ PULL
9. Assess flight conditions:
If in Visual Meteorological Conditions (VMC):
a. Pitot Heat...........................................................................OFF
b. Ice Protection.....................................................................OFF
If in Instrument Meteorological Conditions (IMC) or visible
moisture:
a. Pitot Heat............................................................................ ON
b. Ice Protection.......................................................ON, As Reqd
c. Strobe Lights .....................................................................OFF
10. Replan flight for a landing as soon as practical (within one hour) at
a landing field with visual minimums. Increase landing speed 10
KIAS for flaps up. Do not use landing lights.
Revision 02: 01-06-10

Table of Contents

Related product manuals