EasyManua.ls Logo

Cisco Catalyst 3550

Cisco Catalyst 3550
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2 Installing and Starting the Switch
Connecting to the GBIC Module Ports
2-38
Catalyst 3550 Multilayer Switch Hardware Installation Guide
78-11358-03
Step 6 Repeat Steps 1 through 5 to connect each port.
Connecting to the GBIC Module Ports
These sections describe how to connect to a GBIC module port. For detailed
instructions on installing, removing, and cabling a GBIC (1000BASE-X module,
1000BASE-T module, or the GigaStack module), refer to your GBIC
documentation.
Connecting to a 1000BASE-X GBIC Module Port
Caution Do not remove the rubber plugs from the fiber-optic port or the rubber caps from
the fiber-optic cable until you are ready to connect the cable. The plugs and caps
protect the fiber-optic port and cable from contamination and ambient light.
Avoid exposure to the laser beam.
Follow these steps to connect to the 1000BASE-X GBIC port:
Step 1 Remove the rubber plugs from the fiber-optic port on the module, and store them
for future use.
Step 2 Insert the SC connector in the fiber-optic receptacle, as shown in Figure 2-36.

Table of Contents

Other manuals for Cisco Catalyst 3550

Related product manuals