Contents
v
Cisco SCE8000 Installation and Configuration Guide, Rel 3.1.7
OL-16478-03
Preventing Electrostatic Discharge Damage 4-3
Environmental Requirements 4-3
Power Requirements 4-4
Power Connection Guidelines 4-4
AC-Powered Systems 4-5
DC-Powered Systems 4-11
Site Planning Checklist 4-12
Installing the Cisco SCE8000 Chassis in the Rack 4-13
Unpacking the Cisco SCE8000 Chassis 4-14
Installation Guidelines 4-14
Required Tools 4-15
Installing the Chassis Brackets 4-15
Installing the Chassis in the Rack 4-16
Installing an Optical Bypass Module 4-17
Connecting the System Ground 4-18
Required Tools and Equipment 4-19
Installing the Power Supplies in the Cisco SCE8000 Chassis 4-20
CHAPTER
5 Connecting the Management Interfaces 5-1
How to Set Up the Local Console 5-1
Initial Setup Parameters 5-2
Connecting the Management Interface 5-4
How to Cable the Management Port 5-4
How to Verify Management Interface Connectivity 5-5
CHAPTER
6 Cabling the Line Ports and Completing the Installation 6-1
Connecting the Line Ports to the Network 6-1
Single Link: Inline Topology 6-2
Single Link: Receive-only Topology 6-2
Dual Link: Single Cisco SCE8000 Topologies 6-2
Dual Link: Two Cisco SCE8000s Topology 6-3
Multi-Gigabit Service Control Platforms (MGSCP) Topologies 6-4
The Optical Bypass Module 6-8
Optical Bypass Module Connectivity 6-9
Cabling the 10GBE Line Interface Ports 6-9
Fiber Specifications 6-10
Optical Device Maintenance 6-10
How to Cable the 10GBE Line Interface Ports 6-10