EasyManua.ls Logo

CITROEN C2 2004 - Page 188

CITROEN C2 2004
523 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
184
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HW - 8HZ
B1BP2LXC
Tools.
[1]
Pliers for removing plastic pegs : 7504-T
[2] Lever for detensioning the dynamic tensioner roller : (-).0194.E
[3] Engine flywheel setting peg : (-).0194.C
[4] Camshaft setting peg : (-).0194.B
[5] Crankshaft and high pressure pump setting peg : (-).0194.A
Preliminar
y operations.
Remove:
- The front RH wheel.
- The front RH splash-shield, using tool [1].
- The clips of the electrical harness on the upper timing cover.
- The accessories belt, using tool [2] (see corresponding operation).
Check ing the setting.
Disconnect the battery negative cable.
Remove the upper timing cover (1).
Rotate the engine using the screw (2) of the crankshaft pulley.
NOTE: The locking hole is located under the crankshaft bearing cap cover.
Undo the screw (2).
Detension the auxiliary drive belt dynamic tensioner roller, using tool [2].
C2 - C3 - C3 PLURIEL - XSARA

Table of Contents