Chapter
3-Sequence
of
Operation
PROGRAMMING SEQUENCE FOR CB20 PROGRAM RELAY
BAR INDICATES
TERMINAL
ENERGIZED
40 50 60
70
80 90 1 00
11
0
PREPURGE-----------------
IGN.
PILOT
FIGURE
3-1.
PROGRAMMING SEQUENCE FOR CB40 PROGRAM RELAY
TERMINAL
ENERGIZED 0
SHADED BAR
INDICATES
TERMINAL
ENERGIZED
1 0 20 30 40
50
60
70
80 90 1 00
11
0 120
PREPURGE----------------~
IGN.
PILOT
FIGURE
3-2.
High
limit
pressure
or
temperature
control
(HLC)
Low
water
cut-off (LWCO)
Low fire switch
(LFS)
Auxiliary
switches (AS-1) (AS-2)
100
and
200 series
only
Gas-oil
selector switch (GOS) 200
series
only
High-low fire
control
(HLFC)
Damper
positioning
switch
(DPS)
The
controls
used
in
the
running
interlock
circuit
are:
Blower
motor
starter
interlock
(BMSI)
Combustion
air
proving
switch
(CAPS)*
*Not
used on
some
100 series
3-2
C. SEQUENCE
OF
OPERATION -
Oil
or
G~s
Applicable
to
a
standardly
equipped
boiler
with
CB-20
flame
safeguard
and
program
control
system.
This
sequence
covers
burner
operation
from
start-
up
thru
shutdown.
No
attempt
is
made
to
correlate
the
action
of
the
fuel
supply
system
or
feedwater
system
except
for
those
controls
that
directly
affect
the
action
of
the
programming
relay.
Refer
to
the
wiring
diagram
supplied
for
this
boiler
in
following
this
sequence.
NOTE:
The
legend
on
the
timer
dial
(Figure
1-3)
indicates
the
position
of
the
timer
and
the
stage
reached
in
the
burner
operating
cycle.
The
bar-graph
shown
in
Figure
3-1,
or
on
the
wiring
diagram,
indicates
the