IGS-NT-BC, SW Version 1.2.0, ©ComAp – January 2019
IGS-NT-BC-1.2.0 Reference Guide.PDF
Setpoint: #PwrBandContr 4
1, 2, 1+2, 3, 1+3, 2+3, 1+2+3 [-]
This setpoint is used to select the gen-sets which will run within the power band
#4 if the optimalization according to gen-set size is active. Learn more about this
topis in the chapter Gen-set size optimalization.
NOTE:
The combinations of gensets must be created so, that the total nominal power of
the Power band #1 < #2 < #3 < #4.
This setpoint is used for adjusting the delay of changing the power band if the load
demand rose above the upper limit of the current power band. Learn more about
this topis in the chapter Gen-set size optimalization.
This setpoint is used for adjusting the delay of changing the power band if the load
demand dropped below the lower limit of the current power band. Learn more
about this topis in the chapter Gen-set size optimalization.
This setpoint selects the logical group to which the particular gen-set belongs. If
there aren't logical groups at the site, adjust the setpoint to 1 (COMMON).