EasyManua.ls Logo

ComAp IM-NT-BB - Page 190

ComAp IM-NT-BB
328 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InteliMains
NT
, SW version 3.0
InteliMains-NT-BTB-3.0-Reference Guide.pdf, ©ComAp June 2013
190
possible
Description
This setpoint is used to adjust the relative load level (in % of total power
transferred from busL to busR - NominBusLImp) for load shedding. When the
power transferred through BTB exceeds this level for more than Ld shed
delay time the next load shedding output is closed.
NOTE:
Learn more about load shedding in the separate chapter Load shedding.
12.2.12.2 Setpoint: Ld shed delay
Group
Load shedding
Range [units]
0.0 .. 600.0 [s]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust time period the percentage of the power
transferred through BTB must be above the Ld shed level limit to close the
next load shedding output.
NOTE:
Learn more about load shedding in the separate chapter Load shedding.
12.2.12.3 Setpoint: Ld recon level
Group
Load shedding
Range [units]
0 .. Ld shed level [%]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust the relative load level (in % of total power
transferred from busL to busR - NominBusLImp) for load reconnection. When
the power transferred through BTB drops below this level for more than Ld
recon delay time the next load can be reconnected back.
The appropriate load shedding output is either opened automatically when
the condition above is fulfiled (AutoLd recon = ENABLED) or manually by
activation of the input ManualLdRecon.
NOTE:

Table of Contents

Related product manuals