Edition 05/2021 - MC – Technical documentation - page 6
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
4 INSTALLATION
4.1 Standby (standby = 2 months):
The first thing to do is to test your machine in a lab.
If the machine stops running for a long time, you could have sediment in some places.
More precisely in small area like the spray nozzle.
4.2 Protections
It is necessary to place before the machine:
o A water shut off valve.
o An electrical protection standard, suitable for voltage and power consumption.
4.3 Water supply
Recommended operating pressure from 0,15 MPa to 0,6 MPa
Water connection pin 3/8"
The water supply pipes must resist to 145 Psi / 1 MPa
4.4 Drain
Without pressure.
A tip on the outlet of the machine and a pipe is supplied with the machine
Ensure a connection that causes no risk of fluid return, and ensure good drainage:
The drainpipe must be located lower than the machine.
Do not create a bend in the exhaust tube.
4.5 Supplying voltage
To be specify when ordering: 230V – 50/60Hz Monofase
Or: 400V – 50/60Hz Trifase