Edition 05/2021 - MC – Technical documentation - page 63
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
18 POWER MANAGEMENT
The Monte Carlo machines are three phase machines
When the machine is connected to a three-phase network, the absorbed power consumption does not need to be flanged.
In this case the Power Management is at its maximum position: 6.
The machine can be connected to a single phase 230V.
In this case:
1: Change the power cable with a cable 3x6 ² (Conti reference: 103600)
2: Depending on the available amperage on the grid (16A / 20A / 32A):
It is necessary to adjust the power consumption of the machine.
Through the Power management (see table below)
3: Here's how to connect the 3x6 ² cable on the general relay machine
Nota Bene:
It is possible to retain the original cable (5x2,5 ²), but in this case:
It is imperative to curb the power management 1 (or 2 maximum if the machine is not used too much)
Power parameters and Current comsumption (for 230 volts monophase)
Power 1 Power 2 Power 3 Power 4 Power 5 Power 6
Max power
(W)
Max current
(A)
Max power
(W)
Max current
(A)
Max power
(W)
Max current
(A)
Max power
(W)
Max
current
(A)
Max power
(W)
Max current
(A)
Max power
(W)
Max
current
(A)
MC 2G 1900 8 3300 14 4700 20 5700 25 6700 29 6700 29
MC 3G 2600 11 4600 20 6600 29 7600 33 8600 37 9600 42
MC 2G K 3000 13 5500 24 7500 33 9500 41 11500 50 11500 50
MC 3G K 3100 13 5600 24 8100 35 10100 44 12100 53 14100 61
Power 1/2/3/4/5/6:
That’s the number of heating element can be supplyied at the same time in the machine
The priority is always given to the coffee Boiler