EasyManua.ls Logo

Cornelius Energize 2 - 7 Putting into and out of Service; Putting into Service; Turning on the Unit

Cornelius Energize 2
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C Energize proizvodna serija
26
7. Putting into and out of Service
7.1 Putting into Service
Comply with the cleaning regulations defined by law before beginning each operation.
Clean the couplings on the container for beverage/syrup every time before you attach them.
Connect coupling to container for beverage/syrup.
Note!: Keep attention to colour coded couplings of CO
2
and beverage/syrup.
Check the CO
2
-pressure at the pressure regulator. It should be within the following standard values:
Open the cylinder valve on the CO
2
-cylinder and the valve on the pressure regulator.
Syrup: 3.5 to 4.0 bar
CO
2
-carbonization pressure: 6 bar
Light products: 0.5 to 1.0 bar
Drinking water: 4.0 to 4.5 bar
Set the CO
2
-pressure by turning the control screw at the regulator valve.
Clockwise to increase the pressure.
Counter-clockwise to reduce the pressure.
Afterwards check the CO
2
-lines for leaks by closing the valve of bottle. The set pressure displayed at the pressure
regulator should not drop. If it does, notify the service technician immediately. Do not forget to re-open the CO
2
-valve
after the check.
Open the water feed line and check the flow pressure in it (minimum value: 2.0 to 3.0 bar). Set it at the control screw on
the water pressure regulator (not in scope of delivery).
Check the beverage/syrup lines for leaks. Only a visual inspection is possible. If liquid is leaking, call a service
technician.
7.2 Turning on the Unit
The water bath must be filled up to the overflow with tap water. Refer to the technical data for the amount required. To
prevent algae from forming in the water, add the disinfectant Molco (PN 14-9670-150). The 150 ml container of
disinfectant is sufficient for 30 litres of water.
Insert the mains plug for the cooler into a socket outlet with an earthed contact.
Ice bank controlled units start working after the water bath fills with water and switch off automatically (3 minutes
delay) after the ice bank is built up.
The control board of the unit has a time delay for switching on and off the cooling system, when it runs in ice bank
mode. After the cooling system is switched on the running time is not less then 5 minutes. Switch off signals will be
ignored during this time. After the cooling system is switched off the break time is not less then 3 minutes. Switch on
signals will be ignored during this time. The break time of 3 minutes is valid for turning on the device and after a break
down of the power supply. These units containing a 3-pin ice bank probe.
When water inlet pressure is within specification, the carbonator pump switches on automatically and fills the
carbonator bowl. The carbonator pump switches off when upper fill level is reached or the preset maximum run time of
20 min has been exceeded. Long run periods are signs of leaks or too large extraction. It is then only possible to turn the
pump back on by a power network reset (pulling out the mains plug briefly).
Attention! At the Energize FF the second carbonator pump do not start working before the carbonator bowl has been
filled to the maximum level one time. Release air from the carbonator container by pulling the safety valve for about 2
to 4 seconds. The circulation pump has to be switch on manual by using the switch at the controller. The circulation
pump does runs in any case.
Attention! Dry running of the circuit pump coursed a damage.

Table of Contents

Other manuals for Cornelius Energize 2

Related product manuals