COSMOHigh‐efficiencypumpCPH2.0 28
CONTENTS
1. Scopeofdelivery
2. StandardsandGuidelines
3. Safety
3.1 Symbolsusedinthemanual
3.2 Personnelrequirements
3.3 Personalprotectiveequipment
3.4 Intendeduse–Liabilityandwarranty
3.5 Residualrisks
4. GeneralnotesonInstallationandtheManual
4.1. Aboutthismanual
5. Aboutthis
Product
5.1. Description
5.1.1. Designtype
5.1.2. Identification
5.1.3. Typelabel
5.1.4. Typecode
6. TechnicalData,Weight,Outputcharacteristics
6.1. GeneraltechnicalData
6.2. Type‐specificData
6.3. Dimensions
6.4. Outputcharacteristics
7. InstallationandElectricalConnection
7.1. Transporttoconstructionsiteandstorage
7.2. Installation
preconditions–Installationsite
7.3. Installingthepump
7.3.1. Installationconditions
7.3.2. Mountingposition
7.3.3. Installationandconnection
7.3.4. Electricalconnection–Positioning
7.3.5. Rotatingtheuserinterface
7.3.6. Insulatingthepumphousing
7.4. Electricalconnections
8. Commissioning,FunctionalTest,Shutdown,Disposal
8.1. Commissioningandfunctionaltest
8.1.1. Controlpanel
8.1.2. Controlmodes
8.1.3. Errormessages
8.1.4. Shutdown
8.1.5. Puttingbackintoservice
8.1.6. Disposal
8.2 Informationfortheplantowner/op erator
9. Maintenance
10. COSMOHotline
11. EUDeclarationofConformity
12. Warranty;AvailabilityGuarantee,Contacts