19
GAS SUPPLY REQUIREMENTS
IMPORTANT:
• Observe all governing codes and ordinances.
• This installation must conform with all local codes and ordinances. In the
absence of local codes, installation must conform with American National
Standard, National Fuel Gas Code ANSI Z223.1/NFPA 54 - latest edition,
or in Canada, the Natural Gas and Propane Installation Code, CAN 1-1.1-
M81 - latest edition.
• Leak testing of the range must be conducted according to the
manufacturer's instructions. Do not use a flame to check for leaks.
WARNING
FIRE AND EXPLOSION HAZARD
• Use a new CSA International approved gas supply line.
• Install a shut-off valve.
• Securely tighten all gas connections.
• If connected to LP, have a qualified person make sure gas pressure does
not exceed the maximum pressure listed in this section.
• Examples of a qualified person include:
- licensed heating personnel
- authorized gas company personnel
- authorized service personnel
• Failure to do so can result in death, explosion or fire.