6.3 TPV Dedusng Unit
1
2
3
4
5
7
8
9
6
1
2
3
4
5
6
7
8
9
Chapter 6: Oponal Devices
a) Click the "Opons" in the soware main
interface to call up the "External Setup” dialog box
and select "Punch Bridge" tap interface;
b) Select a valid bridge number(BGP #num)
according to the number ID of the BGP Punch Bridge
device connected (ck the check box of "Enable
Bridge" ) , repeat steps if CTP device is connected to
more than 1 unit BGP device connecons. Maximum
supports up to 4 BGP devices only.
c) For correct “Bridge Type" model selecon, you
may refer to label applied on BGP device electrical
box cover.
a) To enable “Punch Bridge” setup page available in Template edit, you need ck on the BGPcheck box in the
Template seng page.
b) Device ID: This command is used to select the sequence number of the current BGP device. This BGP device
can support mul-BGP device connecon.
c) Entrance direcon: set the orientaon of the plate entering onto the BGP device, the device supports 4-ways
of different orientaon;
d) Exit direcon: set the direcon of the plate leaving the BGP device, the device supports 4-waysof different
orientaon;
e) Mold (Die punch) selecon: ck to select the right Punch Die set from groups of available Punching Units in
BGP device to be used for the current working Template. Each working Template can only supports one single
group of Punch mold to work with. The BGP Punch Bridge device can only supports up to 3groups (or sets) of
Punch molds installaon.
a) Periodically discharge air tank water
b) Regularly clean the BGP device, conveyor belts, rollers, side gauge lower bar rubber surface
c) Regularly check the cylinder support rod lubricaon and sealing condions
d) Replace cylinder seals every 24 months
TPV-1180 Vacuum Dedusng unit is an oponal peripheral device used to remove the dust generated during
plate/media exposure carried out on a CTP device.
a) Pipe connecon: connect vacuum pipe (hose Φ32) to the TPV pipe inlet connector and the host CTP device
vacuum piper outlet adapter, faster both end pipe connecons with the use of stainless steel hoops φ25-38.
b) Connect the power cord: TPV input power cord to be connected to the host CTP indicated vacuum power
connector.
a) The working status of the TPV is influenced by the host CTP device. When the CTP device is
working(imaging plate), the TPV dedusng unit will be running and operang indicator light will be on. When
the CTP device finishes the plate imaging operaon, the TPV dedusng unit will stopped, and the operang
status indicator light will be off.
b) When TPV motor temperature exceeded 80°C , the alarm indicator of the TPV unit will be on to remind the
user of TPV unit status, and may need to stop the unit for cooling down or require for service and repair if
necessary.
c) When TPV motor temperature exceeded 100°C, the alarm indicator of the TPV unit will be on to remind
the user of the TPVunit status and cut off the input power of the TPV unit.
Regular cleaning: every 3 months to clean the filter, replace the filter every year.
Filter replacement method:
a) Open the TPV unit top cover
b) Remove the internal lter for cleaning or
replacement
c) Put back the cleaned filter (new)
d) Close & lock thetop cover
6.2.3BGP Punch Bridge other oponal sengs
6.2.4BGP Punch Bridge in Template sengs
6.2.5BGP Punch Bridge maintenance
For detail maintenance informaon, please refer to "BGP Punch Bridge-D4 installaon guide”
6.3.1 Operaon and structure descripon
6.3.2TPV Connecon
6.3.3Working status
6.3.4TPV unit maintenance
Top cover
TPV body
Filter
Vacuum motor
Temperature protecon switch
Power ON/Off
Operang indicator light
Alarm indicator light
Dedusng pipe inlet connecon