8 Culligan® All Purpose Cooler
8 Cat. No. 01023621
7. Adjust the cold water temperature by regulating the thermostat situated at the back of the unit. This ther-
mostat is set at a specific point at the factory. This point is marked out by a small dot situated on the out-
side of the thermostat.
8. After 45 minutes, verify proper heating and chilling.
9. Turn the Red Power Switch OFF.
10. Hold a pitcher under the Hot dispensing faucet. Depress the Hot unlock button, followed by the Hot dis-
pense button, and allow water to continuously run through the hot tank until the water runs cool from the
faucet. This is done to avoid scalding during draining.
11. Disconnect the power cord from the 120 Volt electrical outlet.
12. Turn off the water supply to the unit.
13. Disconnect the water supply from the unit.
14. Remove filters to allow room to drain hot and cold tanks.
15. Make sure you have a suitable container in order to drain the All Purpose Cooler. Disconnect the 90°
elbow after the solenoid. Lower tubing to drain hot tank. Reconnect 90° elbow. Repeat step to drain cold
tank. Wipe down any excess water inside and around the unit.
16. Re-install lter cartridges.
17. Return cooler to the original box.
18. The All Purpose Cooler should be installed within 24 hours.
NOTE Prepare all filters, RO cartridges, and the RO storage tank strictly in accordance with the instructions
included in the Appendix section of the manual