EasyManua.ls Logo

Culligan D1021870 - Page 5

Culligan D1021870
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Key Pre-Delivery Activities v
Cat. No. 01023621
Pre-Delivery Activity: Prepare and Flush Water Treatment Components
CAUTION! All RO Membranes will require a 24-hour flush to drain. All flushing of membranes
and filters must be done with chlorine-free, filtered, softened water.
Activity All Purpose
Aqua-Cleer
Filter
All Purpose
Aqua-Cleer RO
All Purpose
LC-100 RO
All Purpose
AC50 RO
Flush the filters to drain for at least five (5) min-
utes with filtered soft water
c
Verify that system includes Automatic Shut-Off
Valve (P1021587)
c c c
Verify that system includes Check Valve
(P1021588)
c c c
Verify system includes Air Gap (44403001 or
equivalent) for system drain
c c c
Flush the RO cartridge to a drain with filtered
softened water for 24 hours prior to installation
c c c
Flush the carbon block filter to drain for at least
five (5) minutes until there are no more carbon
fines observed.
c
Activate the Preferred Series 250 cartridge and
thoroughly flush per the detailed instructions
c
Flush the pre-carbon filter and sediment filters
to drain
c
Flush the carbon post filter to drain
c c c
Sanitize and flush the storage tank
c c c
Pre-Delivery Activity: Prepare and Flush Cooler for Service
Activity All Purpose Cooler
Unpack the Cooler.
c
Inspect the Cooler for any shipping damage.
c
Flush and test the Cooler.
c
See the appendixes for details about these activities.

Related product manuals