IMPORTANT SAFETY INFORMATION — CONTINUED
7
WARNING
When using one boom tube and nose unit, factory supplied boom tube may be replaced but
must meet the following specifications:
• Only use 3" schedule 40 pipe or 3"
rigid conduit
• Check sight holes to be sure boom tubes
are fully inserted. Then tighten 1/2-13 × 2"
hex bolt (user provided).
• DO NOT transport the puller on the carriage
with boom tubes other than the factory
supplied 3' and 4' tubes.
When using elbow unit, nose unit and both boom tubes, factory supplied boom
tubes may be replaced but must meet the following specifications:
• Only use 3" schedule 40 pipe or 3"
rigid conduit
• Check sight holes to be sure boom tubes
are fully inserted. Then tighten 1/2-13 × 2"
hex bolt (user provided).
• DO NOT transport the puller on the
carriage with boom tubes other than the
factory supplied 3' and 4' tubes.
WARNING
When using the Model #2281 chain mount, never tighten chain as shown in Figure
A. This causes side loading of the chain and can result in failure of the chain or
screw causing components to come loose and possibly cause serious injury or
death. Figure B shows the proper alignment of screw and chain for tightening.
N
Figure A Figure B
1/2-13 × 2"
Hex Head Bolt
3' min. to 10' max.
3' min. to 10' max.
3' min. to 10' max.
1/2-13 × 2"
Hex Head Bolt
1/2-13 × 2"
Hex Head Bolt
1/2-13 × 2"