Custers Hydraulica B.V. Venray NL
26-mrt-
20 www.custers.nl
17
Fig.28
21: Climb to the 3m. level through the
hatch;
Fig.29
22: Place both 8-rung frames;
23: Place locking pins between the
frames themselves;
24: Place two Safe Guard
guardrail frames on the upper
rung: one to façade side and
the other one in the middle.
Click the diagonal ledgers in place on
the 5
th
rung of the frame in question;
Fig.30
25: Place the platform with hatch
to façade side (on the 5
th
rung from the top);
26: Slide both blow-away protections
under the rung;