Custers Hydraulica B.V. Venray NL
26-mrt-
20 www.custers.nl
18
Fig.31
27: Climb to the next level
through the hatch;
Fig.32
28: Place both 8-rung frames;
29: Place locking pins between the
frames themselves;
30: Place two Safe Guard guardrail frames
on the upper rung one to façade side
and the other one in the middle. Click
the diagonal ledgers in place on the
5
th
rung of the frame in question;
Fig.33
31: Place the platform (on the 5
th
rung from the top) at the “street side”;
slide both blow-away protections
under the rung;
32: Place the platform with hatch to façade
side; slide both blow-away protections
under the rung;